Arch, 2014
The work is piece of the bridge that is built on top of a rock between elementary- and high school buildings. Two concrete pillars hold asphalt paved two-lane car way resting on 8.5 meters. Middle of the road is painted double yellow lines. Streetlight at top is burning during the dark hours of the day. Work is firmly attached to its surroundings. However at same time it is reaching already somewhere else, a place which is still unknown. w/ Anssi Pulkkinen
Previous
Previous
(In)Sight, 2016
Next
Next